| Design Criteria |
| Max/Min Operating Water Depth: |
246/ 16ft |
| Max Rated Drilling Depth: |
20000 ft |
| Storage Capacities |
| Fuel Oil: |
7880.8 ft3 (223.36m3) |
| Lube oil: |
176.4 ft3 (5 m3) |
| Drilling Water: |
42312.4 ft3 (1199.23m3) |
| Potable Water: |
10789.542 ft3 (305.8m3) |
| Bulk Mud: |
3994ft3 (113.2m3) |
| Bulk Cement: |
3994ft3 (113.2 m3) |
| Heavy Mud Accepted: |
518.661ft3 (14.7m3) |
| Total of Active Mud and Reserve Mud: |
9702.82 ft3 (275 m3) |
| Sack Storage: |
2000(sacks) |
| Main Dimensions |
| Length Overall£º |
212.33¡¯ (64.719 meters) |
| Breadth Overall: |
176¡¯ (53.645 meters) |
| Length of Hull: |
230'-10" (64.719 meters) |
| Breadth of Hull: |
249'-4" (53.645meters) |
| Depth of Hull: |
31'-0" (6.096 meters) |
| Overall Length of Leg: |
360.348 ft including Spud Cans |
| Number of Legs: |
3 |
| Type of Legs: |
Independent/Triangular |
| Heli-Deck Diameter: |
21.336M |
| Max. Cantilever Combined Load: |
1,000 kips at 45ft/0ft |
| 500kips at 45ft/12ft |
| Living quarters: |
98 persons per UK HSE |
| Maximum Gross Variable Load |
| Transit VL: |
1164.42t |
| Drilling VL: |
1346.5t |
| Survival VL: |
1270t |
| Jacking VL: |
1270t |
| Power Equipment |
| Main Diesel: |
Caterpillar D 3516AT I |
| Diesel Engines: |
1187KW x 4, 1200 rpm |
| Main Generators: |
1062.5KVAx4, 60Hz,0.8pf |
| DC MOTOR Drilling System: |
5GE752R3A,800HP,Siemens |
| Drilling Equipment |
| Draw works: |
National 1320-UE |
| Derrick: |
National TYPE A |
| Traveling Block: |
National 660H500 6 x60 |
| Crown Block: |
National 760-FA 7x60 |
| Top Driver: |
VARCO IDS-1 |
| Rotary Table: |
National C-375 |
| BOP Equipment |
| BOP Stack: |
One Set Hydril Annual 13-5/8" 5K£¬Two Set Shaffer RAM 10K |
| One Set Hydril 21-1/4¡± 2K |
| BOP Control System: |
KOOMEY INC. |
| Accommodation |
| Company Representative¡¯s Office: |
1 |
| Contractor¡¯s Representative¡¯s Office: |
1 |
| Control Room: |
1 |
| Radio Room: |
1 |
| Helicopter Assembly Room: |
1 |
| Hospital / No of Beds |
1/0 |
| Accommodations: |
|
Number of single rooms:
|
1 |
Number of double rooms:
|
3 |
| Toilets: |
14 |
| Showers: |
25 |
| Galley: |
1 |
| Recreation Room: |
2 |
| Gym: |
0 |
| Changing Room: |
2 |
| Deck Crane |
| Crane: |
PCM£100AS |
| Location: |
FWD Port STBD |
| Boom Length: |
FWD 100ft PORT 120ft STBD 120ft |
| Block capacities and hoisting speeds: |
|
| Load/Radius/Speed (min. radius): |
22.5t/ 28.2ft/24m/min |
| Load/Radius/Speed(max.radius): |
3.4/120ft/24m/min |
| Jacking Systems and Rack chock system |
| Make/type: |
Marathon Letouneau co |
| No. of jacks: |
36 units |
| Maximum normal jacking capacity: |
681 ton/units |
| Maximum preload jacking capacity: |
1089.6 ton/units |
| Jacking speed: |
1.6ft/min |
| Rack chocks available: |
Yes |